Cette page n’est pas encore entièrement traduite. Les passages qui manquent s’affichent en anglais pour l’instant. Lire la version anglaise →

Rappel pour compagnons Refresher 6 of 10 · about 8 min

Meter safety re-cert refresher

What you’ll learn

  • Which measurement category belongs where, and why the category beats the voltage number.
  • Live-dead-live, and why a zero reading means nothing on its own.
  • What to inspect on the meter, the leads and the fuses before you use them.
  • The amps-jack trap and the other habits that keep a meter from becoming the fault.
CAT IV service, meter base, outdoor CAT III panels, feeders, fixed equipment CAT II receptacle loads more energy less energy closer to the source → higher category
Measurement categories follow the supply from the source inward. Pick the meter for the most severe place you will put the probes today.

The quick rules

VérifierWhat you are looking for
Category and voltageCategory right for the location first; voltage at or above the system you are on.
Case and displayNo cracks, no missing screws, battery good, rating marks readable.
LeadsInsulation intact, finger guards on, shrouded plugs, rating at least the meter’s. No exposed metal beyond the tip.
FusesCorrect maker-specified type and interrupting rating. Test them with the meter’s own fuse check if it has one.
JacksLeads in the voltage jack before you touch anything live — not the amps jack.
ProofLive-dead-live on a known source, every time you test for absence of voltage.

Worked: proving a 600 V motor feeder dead

  1. Location is the load side of a disconnect in the plant distribution: CAT III at least, rated for 600 V or more.
  2. Lock out the disconnect. Prove the meter on a known live 600 V source (or a proving unit): it reads about 600 V.
  3. Test the feeder at the point of work: L1–L2, L2–L3, L1–L3, and each line to ground — six readings, all zero.
  4. Prove the meter on the known source again: it still reads about 600 V. Only now is the zero trusted.

Sur le chantier

Tips

  • Carry a proving unit so live-dead-live does not depend on finding a live circuit nearby.
  • Clip one lead on and probe with the other when you can — one hand stays out of the circuit.
  • Keep the meter’s category and your leads’ category the same or better; the lower one sets your real rating.

Common mistakes

  • Using a CAT II meter in a CAT III or IV location because it “reads 1000 V”.
  • Replacing a meter fuse with whatever fits.
  • Testing for dead without testing the meter.
  • Leaving the leads in the amps jack after a current reading.

Check yourself

0 right of 0 answered 6 questions · pick one answer each

  1. 1.Which measurement location calls for the HIGHEST measurement category (CAT) rating?

  2. 2.A meter marked CAT III 1000 V and one marked CAT IV 600 V. Which is the right tool at a 600 V service entrance?

  3. 3.What is the correct order of a “test before touch” (live-dead-live) check?

  4. 4.Your meter’s current fuse blew. What goes back in?

  5. 5.You try to read voltage but the leads are still plugged into the amps jack. What is the danger?

  6. 6.Which of these is a reason to take a meter or its leads out of service?

Questions fréquentes

Is a meter re-cert a legal requirement?

That depends on your province or state, your employer and your site. Many employers run periodic meter-safety training as part of their electrical safety program under CSA Z462 in Canada or NFPA 70E in the US. This page is a refresher on the ideas those courses cover, not a substitute for the course your employer requires.

Do I still need PPE with a good CAT IV meter?

Yes. The meter’s rating protects against the meter failing; it does nothing about an arc started by a slipped probe, a dropped tool or a failing piece of equipment. The PPE for energized work comes from your employer’s risk assessment.

Is a non-contact voltage tester enough to prove dead?

No. A non-contact tester is a quick warning, not proof. It can miss shielded cable, DC and a circuit with a weak battery in the tester. Prove dead with a contact meter, live-dead-live.

Voir aussi

Vous voyez une erreur sur cette page? Signalez-la

Nous joindrons cette page et les nombres que vous avez tapés. Nous lisons chaque signalement, mais nous ne pouvons pas y répondre.

Merci — votre signalement a été envoyé.

L’envoi n’a pas fonctionné. Veuillez réessayer plus tard.